India vs Japan on the Bullet Train: Why India Chose ETCS Signalling, B28, and B35 Over a Closed Shinkansen Deal
Japan wanted an integrated Shinkansen package of trains and signalling. Faced with E5 phase-outs, E10 delays, and a 4,000-km national rail plan, India unbundled the system around ETCS, B28, and B35.
